www.johnstone-westmichigan.com

Muskegon / Grand Rapids / Kalamazoo / Holland

Click here to log into your account
Home
About us
Catalog Request
Dealer Resources
Home Owners
News
Preseason Special
Services
Technician's Corner
Training JS University
Manufacturers
Products
Promotions
Muskegon
Holland
Grand Rapids
Kalamazoo
 

 

 

 

Johnstone Corp.
For national info on Johnstone Supply, visit our Corporate Site

 

 
 
DELIVERY INFORMATION
Did you know we deliver on our own fleet of trucks?
Find out more here.
 

 
 
APPLY FOR AN OPEN ACCOUNT
Our Credit Application is now available online. Requires Adobe Acrobat Reader.

 
SHEET METAL PRODUCTS
Seal-Tite is simply the best brand available today.
Find out why.

 
 
Johnstone Supply is  your source for quality AO Smith water heaters!
 
 
 
 
 
 
 
 
 
 
 
Sequence of Operation for Janitrol GMP & GMPN Models
I.  Power to unit
    1.  Door switch must be closed
    2.  Transformer energized

II.  Thermostat Call for Fan Only (R-G)
    1.  Fuse must be closed
    2.  Blower safety limit must be closed

III.  Thermostat Call for Heat (R-W)
    1.  Fuse must be closed
    2.  Blower safety limit must be closed
    3.  Power vent relay energized on board
        A.  Power vent relay contacts close on board
            1.  Power vent motor starts
                a.  Pressure switch closes
                    1.  15 second timer built into board to prove air flow.
    4.  Hot surface ignitor relay energized on board.
        A.  Hot surface ignitor is energized.
    5.  Gas Valve energized after 17 second delay.
        A.  Rollout switches, high limit switch and stack overtemp switch must be closed.
    6.  Flame sensor allows 7 seconds to prove flame.  After 3 tries and no flame a 1 hour lockout occurs.  Lockout can
         can be overridden by turning the unit off for more that 2 seconds and back on again.
    7.  Indoor blower motor starts 30 seconds after proof of flame.

IV.  Thermostat Satisfied
    1.  Gas Valve shuts extinguishing flame.
    2.  Vent motor continues to run for 29 seconds (post purge)
    3.  Blower continues to run for 150 seconds.

Ignition Control Board (ICB) Self diagnostic light signals. 
Blinks
   
1.  If any of the safety limits are open the light will blink 4 times
    2.  If the vent pressure switch is closed before the vent motor even starts the light will blink
2 times
    3.  If the pressure switch does not close after the vent motor starts the light will blink
3 time.

Back to Technician's Corner Home

See Also
Gas Pipe Sizing for Iron
Checking the Firing Rate
Janitrol Metal Drain Pan Reference
Sequence of Operation for Janitrol GMP

 

 

 

 

 

 

 


 

 

 

 

 


Home | Order Online | Products | Manufacturers | Specials | Services Training/Certification
Johnstone News | Technician's Corner | Catalog Request | Home Owners | About us
Copyright © 2008 Comfort Control Johnstone Supply.